logo
ProjectClosed

Old US 23 Pathway

Sector: Forest Products and Packaging • Location: Brighton, Michigan, United States of America

Source: Dodge USA

1.69 miles of pathway along Old US-23 in Brighton Township containing approximately 700 feet of 5' concrete sidewalk, 3200 feet of 10' timber boardwalk, two precast concrete boardwalk sections, and 4800 feet of 8-10' asphalt pathway.

Status
Closed
Sector
Forest Products and Packaging, Cement, Road, Car parking, Automotive, Government, Commercial
Location
Brighton, Michigan, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Old US 23 Pathway

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Old US 23 Pathway” is an infrastructure initiative in the Forest Products and Packaging sector, located in Brighton, Michigan, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

1.69 miles of pathway along Old US-23 in Brighton Township containing approximately 700 feet of 5' concrete sidewalk, 3200 feet of 10' timber boardwalk, two precast concrete boardwalk sections, and 4800 feet of 8-10' asphalt pathway.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Brighton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Forest Products and Packaging, Cement, Road, Car parking, Automotive, Government, Commercial

Article published date

2024-04-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project