Oldham Village Apartments Phase 1
Sector: Manufacturing (Industrial) • Location: Lee'S Summit, Missouri, United States of America
Source: Dodge USA
Proposes 4 - story Apartments and swimming pool on lot 2 with building footprint area of 99,780 sf. Exterior materials to include, Lap siding SW Snowbound 7004, Lap siding SW Jogging Path 7638, Lap siding SW Urbane bronze 7048, Lap siding Wood-Look, stone veneer, brick veneer - Endicott Sienna Ironspot, Trim SW Urbane Bronze 7048, Fiber cement panels.
- Status
- Failure
- Sector
- Manufacturing (Industrial), Commercial, Residential
- Location
- Lee'S Summit, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Oldham Village Apartments Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Abandoned |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Proposes 4 - story Apartments and swimming pool on lot 2 with building footprint area of 99,780 sf. Exterior materials to include, Lap siding SW Snowbound 7004, Lap siding SW Jogging Path 7638, Lap siding SW Urbane bronze 7048, Lap siding Wood-Look, stone veneer, brick veneer - Endicott Sienna Ironspot, Trim SW Urbane Bronze 7048, Fiber cement panels. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Lee'S Summit |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Residential |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
