logo
ProjectGc Bidding

Olin E. Teague VAMC Boiler Plant Replacement

Gc bidding · Texas · Last reported Nov 2024

Source: Dodge USA

This project will replace the existing boiler plant (Bldg. 58) equipment and the new building to create a new 13,700 SF Energy Center that will serve the entire Temple campus and connection all utility systems to existing utility feeds. The new Energy Center will incorporate 3 large water-tube boilers (17,500 lbs./hr.) to accommodate the campus steam load. The Energy Center will house the boiler p

Status
Under Construction
Sector
Water Supply and Storage, Hospital, Residential, Raw Materials, Fertilizers, Commercial, Hotel, Power Generation (CCGT), Power Transmission, Manufacturing (Industrial)
Location
Temple, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Olin E. Teague VAMC Boiler Plant Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Olin E. Teague VAMC Boiler Plant Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Temple, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

GC Bidding

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project will replace the existing boiler plant (Bldg. 58) equipment and the new building to create a new 13,700 SF Energy Center that will serve the entire Temple campus and connection all utility systems to existing utility feeds. The new Energy Center will incorporate 3 large water-tube boilers (17,500 lbs./hr.) to accommodate the campus steam load. The Energy Center will house the boiler plant, engineering control center, associated electrical switchgear, boiler plant emergency genera...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Temple

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Hospital, Residential, Raw Materials, Fertilizers, Commercial, Hotel, Power Generation (CCGT), Power Transmission, Manufacturing (Industrial)

Article published date

2024-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project