Olive Boulevard Resurfacing
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This project provides for the pavement resurfacing and improvements of Olive Boulevard from Ferguson Avenue to Skinker Boulevard. Pavement resurfacing and sidewalk repairs, Pavement joints, curb repairs, and curb replacement, Accessible Pedestrian Signal (APS) installation Road lane reduction for bike lanes, Sidewalk repairs Traffic signal replacement at Kingsland Avenue
- Status
- Prospective
- Sector
- Car parking, Road, Automotive, Government, Commercial
- Location
- St. Louis, Missouri, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Olive Boulevard Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This project provides for the pavement resurfacing and improvements of Olive Boulevard from Ferguson Avenue to Skinker Boulevard. Pavement resurfacing and sidewalk repairs, Pavement joints, curb repairs, and curb replacement, Accessible Pedestrian Signal (APS) installation Road lane reduction for bike lanes, Sidewalk repairs Traffic signal replacement at Kingsland Avenue |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | St. Louis |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Automotive, Government, Commercial |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
