Olkaria 1GW AI Data Center Project
Sector: Geothermal • Location: Naivasha, Kenya
Source: Streamline Feed
A planned 1-gigawatt artificial intelligence data center campus at the Olkaria geothermal fields in Naivasha, Kenya, intended to be powered by geothermal energy. The project was to be developed by Microsoft and G42, with a 100-megawatt Phase One facility originally slated to be operational by May 2026. However, the project has stalled with no construction started, missing environmental clearances,
- Status
- Closed
- Sector
- Geothermal, Data Center, Power Generation (CCGT)
- Location
- Naivasha, Kenya
- Updated
- 22 Jul 2026
- Source
- Streamline Feed
ConstructChat
Ask ConstructChat about Olkaria 1GW AI Data Center Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | stalled |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A planned 1-gigawatt artificial intelligence data center campus at the Olkaria geothermal fields in Naivasha, Kenya, intended to be powered by geothermal energy. The project was to be developed by Microsoft and G42, with a 100-megawatt Phase One facility originally slated to be operational by May 2026. However, the project has stalled with no construction started, missing environmental clearances, and grid capacity limitations. |
Original sector | Development & Infrastructure |
Budget |
Location
Country | Kenya |
City | Naivasha |
Source
Source | Streamline Feed |
URL |
More Details
Record type | Project |
Sector | Geothermal, Data Center, Power Generation (CCGT) |
Article published date | 2026-07-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
