logo

Olkaria II Extension

Sector: Water Supply and Storage • Location: Kenya

Source: European Investment Bank (EIB)

Project
Signed

Extension of the powerhouse, substation and switchyard of the existing 70 MW geothermal station and installation of a third steam turbine and generator set of 35 MW capacity. The project includes steamfield development, of which the drilling and fitting out of geothermal and re-injection wells is already complete.

Project Information FAQ

Project Information

4 Q
The project “Olkaria II Extension” is an infrastructure initiative in the Water Supply and Storage sector, located in Kenya. Taiyo aggregates data on it from European Investment Bank (EIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

signed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Extension of the powerhouse, substation and switchyard of the existing 70 MW geothermal station and installation of a third steam turbine and generator set of 35 MW capacity. The project includes steamfield development, of which the drilling and fitting out of geothermal and re-injection wells is already complete.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data