The Olympic Park site will be surrounded by an 11km loop road. The park will be connected with more than 30 new bridges, both temporary and permanent. An aerial image of the first of the five bridges to be installed around the Olympic Stadium. The Olympic stadium structures, bridges and highways project is the largest construction project undertaken by the Olympic Delivery Authority (ODA). The pro

Project Information FAQ

Project Information

4 Q
The project “Olympic Park Bridges and Highways Project, London” is an infrastructure initiative in the Bridge sector, located in Thailand. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Olympic Park site will be surrounded by an 11km loop road. The park will be connected with more than 30 new bridges, both temporary and permanent. An aerial image of the first of the five bridges to be installed around the Olympic Stadium. The Olympic stadium structures, bridges and highways project is the largest construction project undertaken by the Olympic Delivery Authority (ODA). The project includes building a network of 30 new bridges and 20km of roads in and around the Olympic park site. The network will create better connectivity throughout the park and provide an accessible Olympic park during the games in 2012. Work on the project began in 2007 and is scheduled for completion by 2012. Construction on 21 bridges is currently underway. The project consists of building a total of 38 bridges and an underpass. The bridges include 12 footbridges, 16 highway bridges, four land-bridges, four under-bridges, two external bridges and one underpass. The project also includes primary and secondary roads, which will be constructed throughout the Olympic park site as well as surrounding areas, including an 11km loop road. Retaining walls, other ancillary structures and drainage systems will be constructed as part of the project. The park will be connected with more than 30 new bridges, both temporary and permanent. Currently, seven bridges are nearing completion. Construction of the main permanent bridge which runs through the centre of the Olympic park is complete. The bridge, also referred to as the Central Park Bridge, measures 30m in length, 18m in width and features a 18m high arch. It connects the park’s main north-south route, linking the Olympic stadium with the Aquatics centre. Serving as the main artery of the park, the bridge will transport the construction traffic throughout the site. The main permanent bridge will be the largest bridge in the park. To accommodate a greater number of spectators, the arch-shaped bridge will be added with temporary elements during the games. Together with these elements, the bridge will total 70m in width. The elements will be removed once the games are over. Pedestrian access to the park will be provided mainly via a 250m-long and 40m-wide land bridge. The land bridge will extend from the Stratford City development across the Aquatics Centre, form the roof of the training pool and stretch towards the Olympic stadium. The bridge will be used by nearly 200,000 people during the games. It was completed last year, in October 2011. To reach the main stadium, five new bridges are being constructed. The stadium will be built over an island that is surrounded by water on three sides. Connecting the stadium with the rest of the park, all of the five bridges have been lifted into place. The first bridge, a footbridge measuring 41m in length and 11m in width, is nearing completion. Located in the north of the Olympic park, the bridge will extend across the River Lea and provide an east-west link throughout the park. Construction on the other four bridges is also underway. The final bridge, measuring 43m in length and 11m in width, was lifted in September 2009. It crosses the City Mill River. Originating from the eastern side of the Olympic stadium, the bridge will merge with other bridges that link the northern and western side of the stadium. To link the Stratford town centre with the Stratford City development, a 130m long and 12m wide town centre link bridge was inaugurated in September 2010. The bridge will run over 11 railways line at the Stratford station. Along with the bridges, the park will be connected with nearly 20km of roads. Work is currently underway on a 12km loop road that will surround the Olympic park site. The loop road will link every venue of the Olympic park with the Olympic village during the games. It will continue to link the Olympic park and provide access to other developments after the games are finished. A 6.4km long Hindhead trunk road was also opened in Surrey in July 2011. The two-lane road includes 1.9km of underground tunnels. Valued at £371m, the road is the largest infrastructure project. The project has been divided into six contract packages: Olympic Park North Civils roads and bridges, Olympic Park South Civils roads and bridges, Wetland Area bridges, Central Park bridge, rail over-bridges and, finally, main stadium area bridges. The contract for the Olympic Park North Civils roads and bridges has been awarded to Skanska Construction Ltd. It includes 5km of roads, two land bridges, one road bridge, two underpasses, retaining walls and other ancillary works. The Olympic Park South Civils roads and bridges contract, including about 3km of loop roads, four road bridges, one footbridge, one permanent bridge, retaining walls and other ancillary works has been awarded to Edmund Nuttall Ltd, which is also the contractor for the Wetland Area bridges package. The Central Park bridge contract has been awarded to Lagan Construction. Contracts for the remaining two packages (rail over-bridges and main stadium area bridges) have been awarded to the Balfour Beatty Group. The two packages include three land bridges, three road bridges, five footbridges, retaining walls and other ancillary works.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data