logo

Olympic Village Housing / chaixetmorel.

Sector: Forest Products and Packaging • Location: France

Source: ArchDaily

Project
Closed

Text description provided by the architects.In this project, that chaixetmorel. realized together with real estate developer VINCI Immobilier, it was necessary to master the balancing act between preserving the existing building, creating suitable accommodation for the athletes, and then continuing to use it as offices for a ministry long after the athletes had left. Chaixetmorel. built a contempo

Project Information FAQ

Project Information

3 Q
The project “Olympic Village Housing / chaixetmorel.” is an infrastructure initiative in the Forest Products and Packaging sector, located in France. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Text description provided by the architects.In this project, that chaixetmorel. realized together with real estate developer VINCI Immobilier, it was necessary to master the balancing act between preserving the existing building, creating suitable accommodation for the athletes, and then continuing to use it as offices for a ministry long after the athletes had left. Chaixetmorel. built a contemporary, innovative, and modern ensemble on an area of around 68,000m2 that houses apartments as well as service, training, and storage facilities. The architects succeeded in integrating the architecturally exciting industrial buildings from the beginning of the 20th century (the Maxwell Hall) and its engineering building (the Copernic Pavilion) into the new use. The campus is structured around them, along a strong east-west axis that forms the heart of the new site. A timber hybrid construction method was used for the new buildings. Many existing materials were reused on site (e.g. demolition concrete in the wire ballast boxes of the new plinth zone) or were taken from demolished buildings elsewhere and given a new life cycle (e.g. raised floors in the office areas). The CO2 footprint was already reduced by around 40% compared to similar projects during construction and will also result in significantly lower energy consumption during future use - first as an Olympic village and later as office space.The Eco district is located in the northern district ofSaint-Denis, on the banks of the Seine, in the heart of an urban fabric that includes several remarkable industrial buildings, including a former power station (Halle Maxwell), industrial architecture from the early 20th century, as well as its engineering building (Pavillon Copernic). Residential and large-scale commercial buildings have been naturally integrated into this fabric, giving the district a harmonious mix of uses. The program complements the current dynamics of the Saint-Denis plain, which is currently undergoing a major transformation. The campus is structured around the Maxwell Hall, along a strong east-west axis that forms the backbone of the site. The two existing buildings have been renovated to match their original dimensions and colors. Entrances were created for the new business. The existing architectural heritage is thus preserved at the heart of the new campus and is an integral part of it.The project's planning also fulfills the ambitions of the city, which wants to use the Games to create social change for an even better quality of life with the creation of "sustainable, inclusive and intelligent spaces". Sector B of the future Athletes' Village, known as "Les Verrières", will house a program of athlete residences and support functions (offices, storage, and service facilities) in the new B1A and B1B buildings. The Maxwell Hall and the Copernicus Pavilion, in contact with the Olympic Square, will house the service functions required by the Athletes' Village: Reception and relaxation areas (fitness), delegation offices, NOC/NPC areas, etc. By creating a biodiversity corridor on three complementary levels, the quality of the whole ensemble is emphasized; these are open spaces in the inner courtyard, planted terraces, viewpoints and connecting roofs.The new buildings are characterized by sober, contemporary architecture that emphasizes qualities of use and innovation and underlines the dialogue between architectural heritage and contemporary architecture. Two new buildings with seven upper floors have been created along Rue des Frères Lumière. On the west side, the gables facing the Copernic building are set back: the fragmentation and recession allow for terraces and generous open spaces. Volumes with three upper floors that connect the buildings serve as connectors and also offer large, planted, and accessible terraces. Between these connectors, extensive gardens provide pleasant, sheltered outdoor areas.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data