logo
ProjectClosed

O&M Master Plan Warehouse Mezzanine Addition & Renov

One of 10,000+ projects Taiyo tracks in Pennsylvania.

Source: Dodge USA

Work Summary: The scope of the project is broken into several sections; the Base Bid and Bid Options 1-6. The Contractor is requested to provide a bid for each Scope of Work. The O&M Garage, Add Alternate No. 1, identified on the drawings is no longer a part of the scope of work for this project. See Sheet A-6 for a visual of the different scopes of work. 2. Scope of Base Bid. a. Utilities 1) Inst

Status
Closed
Sector
Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Warehouse, Commercial, Car parking, Power Transmission, Government, Steel, Automotive, Power Generation (CCGT)
Location
West Mifflin, Pennsylvania, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about O&M Master Plan Warehouse Mezzanine Addition & Renov

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “O&M Master Plan Warehouse Mezzanine Addition & Renov” is an infrastructure initiative in the Water Supply and Storage sector, located in West Mifflin, Pennsylvania, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work Summary: The scope of the project is broken into several sections; the Base Bid and Bid Options 1-6. The Contractor is requested to provide a bid for each Scope of Work. The O&M Garage, Add Alternate No. 1, identified on the drawings is no longer a part of the scope of work for this project. See Sheet A-6 for a visual of the different scopes of work. 2. Scope of Base Bid. a. Utilities 1) Install water and sewer utilities to the building. b. Renovate the first floor of existing warehouse ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

City

West Mifflin

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Warehouse, Commercial, Car parking, Power Transmission, Government, Steel, Automotive, Power Generation (CCGT)

Article published date

2024-10-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project