Oman-GCC 400kV Double-Circuit Transmission Line
Sector: Power Generation (CCGT) • Location: Ibri, Oman
Source: Utilities Middle East
A direct electricity interconnection project linking the GCC Interconnection Authority's grid with Oman's grid. It involves constructing a 400-kilovolt double-circuit transmission line connecting the Al-Sila station in the UAE with the Ibri station in Oman, spanning 530 km. The project aims to enhance regional energy security and facilitate electricity trade among GCC member states.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | A direct electricity interconnection project linking the GCC Interconnection Authority's grid with Oman's grid. It involves constructing a 400-kilovolt double-circuit transmission line connecting the Al-Sila station in the UAE with the Ibri station in Oman, spanning 530 km. The project aims to enhance regional energy security and facilitate electricity trade among GCC member states. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
