logo
ProjectDpr/Feasibility Study

Omkareshwar floating solar project

The status, timeline and source of this project. A free account opens every field.

Source: India Investment Grid (IIG)

Information New and Renewable Energy Department, Madhya Pradesh has come up with Omkareshwar floating solar project with a ticket size of 3000 INR Crores. 600 MW flaoting solar to be set up at Omkareshwar reservoir in Khandwa district of Madhya Pradesh. Pre feasibility study done. RfP for DPR preparation and transaction advisor issued

Status
Prospective
Sector
Power Generation (CCGT), Water Supply and Storage, Solar, Government, Hydro, Biomass, Wind
Location
Khandwa, Madhya Pradesh, India
Updated
19 Nov 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about Omkareshwar floating solar project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Omkareshwar floating solar project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Khandwa, Madhya Pradesh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Status

Original status

dpr/feasibility study

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Information New and Renewable Energy Department, Madhya Pradesh has come up with Omkareshwar floating solar project with a ticket size of 3000 INR Crores. 600 MW flaoting solar to be set up at Omkareshwar reservoir in Khandwa district of Madhya Pradesh. Pre feasibility study done. RfP for DPR preparation and transaction advisor issued

Original sector

Electricity Generation

Procurement method

Budget

Location

Country

India

State

Madhya Pradesh

City

Khandwa

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Water Supply and Storage, Solar, Government, Hydro, Biomass, Wind

Article published date

2024-02-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project