OMU - Transmission & Distribution Pole Reconductor
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
For the labor and equipment required to complete a transmission and distribution project spanning a route totaling 5,700 feet in length. This project will consist of transmission and distribution pole change outs, route relocation and transmission reconductor. The transmission reconductor of the 69kV circuit will be from 397 ACSR to 795 ACSR along the affected pole route. All existing transmission
- Status
- Prospective
- Sector
- Steel, Government, Road, Power Generation (CCGT), Power Transmission, Commercial, Metal
- Location
- Owensboro, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about OMU - Transmission & Distribution Pole Reconductor
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | For the labor and equipment required to complete a transmission and distribution project spanning a route totaling 5,700 feet in length. This project will consist of transmission and distribution pole change outs, route relocation and transmission reconductor. The transmission reconductor of the 69kV circuit will be from 397 ACSR to 795 ACSR along the affected pole route. All existing transmission class poles to be replaced are wood; all new transmission class poles will be steel and provided... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Owensboro |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Steel, Government, Road, Power Generation (CCGT), Power Transmission, Commercial, Metal |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
