OMV 140 MW Green Hydrogen Facility
Sector: Hydrogen • Location: Bruck an der Leitha, Lower Austria, Austria
Source: Energies Media
OMV and Masdar have launched a joint venture to develop a 140 MW green hydrogen electrolyzer plant in Bruck an der Leitha, Lower Austria. The facility aims to become one of Europe's largest green hydrogen production plants and supports Austria's ambition to become a regional hydrogen hub. Construction has already started, with full operation expected by 2027. The joint venture will be majority-own
- Status
- Under Construction
- Sector
- Hydrogen
- Location
- Bruck an der Leitha, Lower Austria, Austria
- Updated
- 22 Jul 2026
- Source
- Energies Media
ConstructChat
Ask ConstructChat about OMV 140 MW Green Hydrogen Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | OMV and Masdar have launched a joint venture to develop a 140 MW green hydrogen electrolyzer plant in Bruck an der Leitha, Lower Austria. The facility aims to become one of Europe's largest green hydrogen production plants and supports Austria's ambition to become a regional hydrogen hub. Construction has already started, with full operation expected by 2027. The joint venture will be majority-owned by OMV, with Masdar holding 49%. |
Original sector | Energy |
Location
Country | Austria |
State | Lower Austria |
City | Bruck an der Leitha |
Source
Source | Energies Media |
URL |
More Details
Record type | Project |
Sector | Hydrogen |
Article published date | 2025-11-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
