OMVG Interconnection Project
Sector: Power Transmission • Location: Western and Central Africa
Source: World Bank Group
The development objective of the Organisation pour la Mise en Valeur du fleuve Gambie (the Gambia River Basin Development Organization) (OMVG) Interconnection Project for Africa is to enable electricity trade between the Gambia, Guinea, Guinea-Bissau, and Senegal. The project comprises of two components. The first component, extension of West African power pool (WAPP) transmission network - OMVG i
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The development objective of the Organisation pour la Mise en Valeur du fleuve Gambie (the Gambia River Basin Development Organization) (OMVG) Interconnection Project for Africa is to enable electricity trade between the Gambia, Guinea, Guinea-Bissau, and Senegal. The project comprises of two components. The first component, extension of West African power pool (WAPP) transmission network - OMVG interconnection is comprised of the following two sub-components: (i) transmission lines to finance the construction of 1,677 kilo meter (km) of 225 kilo volt (kV) transmission network capable of handling 800 megawatt (MW); and (ii) substations to finance the construction of fifteen 225-30 kV substations and dispatching centers on the interconnection (located in the corresponding substation). The second component, technical assistance to OMVG is comprised of the following two sub-components: (i) implementation support will finance costs of the project management unit (PMU), project supervision costs including the owners engineer, costs associated with implementing the environmental and social management plan (ESMP) and resettlement action plans (RAPs), internal audits, technical assistance (TA) related to the fiber optic cables, as well as further study of how to strengthen or mainstream collaboration between OMVG and Organisation pour la Mise en Valeur du fleuve Senegal (Senegal River Basin Development Organization) (OMVS); and (ii) operations and maintenance (O and M) support to OMVG transmission company will finance part of the O and M fees during the first five years of operation (expected FY2018-2022), on a sliding scale. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Power Transmission projects in Western and Central Africa
- North Core/Dorsale Nord Regional Power Interconnector Project
- WAPP APL 1 (2nd Phase - COASTAL TRANSMISSION BACKBONE)
- WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE)
- WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE)
- North Core/Dorsale Nord Regional Power Interconnector Project
- West Africa Regional Energy Trade Development Policy Financing Program
- WAPP APL 1 (2nd Phase - COASTAL TRANSMISSION BACKBONE)
- WAPP APL4 (Phase 1) - Côte d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development