OMVG Interconnection Project
Sector: Power Transmission • Location: Western and Central Africa
Source: World Bank
The development objective of the Organisation pour la Mise en Valeur du fleuve Gambie (the Gambia River Basin Development Organization) (OMVG) Interconnection Project for Africa is to enable electricity trade between the Gambia, Guinea, Guinea-Bissau, and Senegal. The project comprises of two components. The first component, extension of West African power pool (WAPP) transmission network - OMVG i
- Status
- Closed
- Sector
- Power Transmission, Broadband, Forest Products and Packaging, Telecommunications, Power Generation (CCGT), Government, Automotive
- Location
- Central African Republic
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about OMVG Interconnection Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objective of the Organisation pour la Mise en Valeur du fleuve Gambie (the Gambia River Basin Development Organization) (OMVG) Interconnection Project for Africa is to enable electricity trade between the Gambia, Guinea, Guinea-Bissau, and Senegal. The project comprises of two components. The first component, extension of West African power pool (WAPP) transmission network - OMVG interconnection is comprised of the following two sub-components: (i) transmission lines to finance the construction of 1,677 kilo meter (km) of 225 kilo volt (kV) transmission network capable of handling 800 megawatt (MW); and (ii) substations to finance the construction of fifteen 225-30 kV substations and dispatching centers on the interconnection (located in the corresponding substation). The second component, technical assistance to OMVG is comprised of the following two sub-components: (i) implementation support will finance costs of the project management unit (PMU), project supervision costs including the owners engineer, costs associated with implementing the environmental and social management plan (ESMP) and resettlement action plans (RAPs), internal audits, technical assistance (TA) related to the fiber optic cables, as well as further study of how to strengthen or mainstream collaboration between OMVG and Organisation pour la Mise en Valeur du fleuve Senegal (Senegal River Basin Development Organization) (OMVS); and (ii) operations and maintenance (O and M) support to OMVG transmission company will finance part of the O and M fees during the first five years of operation (expected FY2018-2022), on a sliding scale. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Central African Republic (CAR) |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Broadband, Forest Products and Packaging, Telecommunications, Power Generation (CCGT), Government, Automotive |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in Western and Central Africa
- WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE)
- OMVG Interconnection Project
- North Core/Dorsale Nord Regional Power Interconnector Project
- WAPP APL 1 (2nd Phase - COASTAL TRANSMISSION BACKBONE)
- WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE)
- North Core/Dorsale Nord Regional Power Interconnector Project
- West Africa Regional Energy Trade Development Policy Financing Program
- WAPP APL 1 (2nd Phase - COASTAL TRANSMISSION BACKBONE)
