OMVS - TRANSMISSION EXPANSION PROJECT
Sector: Road • Location: Western and Central Africa
Source: World Bank
The development objective of the OMVS Transmission Expansion Project for Western Africa is to enhance electricity trade among Mali, Mauritania, and Senegal.The project consists of two components: (1) RIMA Reinforcement and Expansion; and (2) Technical Assistance. The first component, RIMA reinforcement and expansion will finance the construction of a new 288 km long 225 kV double circuit transmiss
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The development objective of the OMVS Transmission Expansion Project for Western Africa is to enhance electricity trade among Mali, Mauritania, and Senegal.The project consists of two components: (1) RIMA Reinforcement and Expansion; and (2) Technical Assistance. The first component, RIMA reinforcement and expansion will finance the construction of a new 288 km long 225 kV double circuit transmission line from Kayes (Mali) to Tambacounda (Senegal), with an estimated wheeling capacity of 400 MW. The line earth system will be equipped with a fiber optic cable (24 pairs) and equipment required to provide electricity access to villages along the route of the line. To connect the line to the system, the IDA Credit will also finance two 225 KV bays at the existing substation in Kayes and at the future substation in Tambacounda. The latter substation is under construction under the World Bank’s cofinanced Organisation pour la Mise en Valeur du fleuve Gambie (OMVG) Interconnection Project. This component divided into two sub-component, (i) Kayes-Tambacounda Transmission Line; and (ii) Supervisory Control and Data Acquisition (SCADA) System; The second component, technical assistance will finance the contract of the Owner’s Engineer that will assist Société de Gestion de l’Energie de Manantali (SOGEM) in implementing the project, including assistance in the procurement process and undertaking the supervision of the works included under sub component 1.1. In addition, this component will finance consultancy services to strengthen SOGEM’s capabilities to implement the Environmental and Social Management Plan (ESMP), Environmental and Social Impact Assessment (ESIA), Resettlement Policy Framework (RPF), and Resettlement Action Plans (RAPs) as well as operating costs. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
