OMVS - TRANSMISSION EXPANSION PROJECT
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The development objective of the OMVS Transmission Expansion Project for Western Africa is to enhance electricity trade among Mali, Mauritania, and Senegal.The project consists of two components: (1) RIMA Reinforcement and Expansion; and (2) Technical Assistance. The first component, RIMA reinforcement and expansion will finance the construction of a new 288 km long 225 kV double circuit transmiss
- Status
- Closed
- Sector
- Road, Power Generation (CCGT), Broadband, Forest Products and Packaging, Telecommunications, Government, Hydro, Automotive
- Location
- Central African Republic
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about OMVS - TRANSMISSION EXPANSION PROJECT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objective of the OMVS Transmission Expansion Project for Western Africa is to enhance electricity trade among Mali, Mauritania, and Senegal.The project consists of two components: (1) RIMA Reinforcement and Expansion; and (2) Technical Assistance. The first component, RIMA reinforcement and expansion will finance the construction of a new 288 km long 225 kV double circuit transmission line from Kayes (Mali) to Tambacounda (Senegal), with an estimated wheeling capacity of 400 MW. The line earth system will be equipped with a fiber optic cable (24 pairs) and equipment required to provide electricity access to villages along the route of the line. To connect the line to the system, the IDA Credit will also finance two 225 KV bays at the existing substation in Kayes and at the future substation in Tambacounda. The latter substation is under construction under the World Bank’s cofinanced Organisation pour la Mise en Valeur du fleuve Gambie (OMVG) Interconnection Project. This component divided into two sub-component, (i) Kayes-Tambacounda Transmission Line; and (ii) Supervisory Control and Data Acquisition (SCADA) System; The second component, technical assistance will finance the contract of the Owner’s Engineer that will assist Société de Gestion de l’Energie de Manantali (SOGEM) in implementing the project, including assistance in the procurement process and undertaking the supervision of the works included under sub component 1.1. In addition, this component will finance consultancy services to strengthen SOGEM’s capabilities to implement the Environmental and Social Management Plan (ESMP), Environmental and Social Impact Assessment (ESIA), Resettlement Policy Framework (RPF), and Resettlement Action Plans (RAPs) as well as operating costs. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Central African Republic (CAR) |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Power Generation (CCGT), Broadband, Forest Products and Packaging, Telecommunications, Government, Hydro, Automotive |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Western and Central Africa
- Lome-Ouagadougou-Niamey Economic Corridor
- Abidjan-Lagos Trade and Transport Facilitation Project (ALTTFP)
- Lake Chad Region Recovery and Development Project
- WAEMU CAPITAL MARKET DEVELOPMENT PROJECT
- West Africa Coastal Areas Resilience Investment Project
- Additional Financing to the Food System Resilience Program, Phase 2 Sierra Leone
- Niger River Basin Management Project
- West Africa Regional Transport and Transit Facilitation Project
