logo
ProjectClosed

OMVS - TRANSMISSION EXPANSION PROJECT

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The development objective of the OMVS Transmission Expansion Project for Western Africa is to enhance electricity trade among Mali, Mauritania, and Senegal.The project consists of two components: (1) RIMA Reinforcement and Expansion; and (2) Technical Assistance. The first component, RIMA reinforcement and expansion will finance the construction of a new 288 km long 225 kV double circuit transmiss

Status
Closed
Sector
Road, Power Generation (CCGT), Broadband, Forest Products and Packaging, Telecommunications, Government, Hydro, Automotive
Location
Central African Republic
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about OMVS - TRANSMISSION EXPANSION PROJECT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “OMVS - TRANSMISSION EXPANSION PROJECT” is an infrastructure initiative in the Road sector, located in Western and Central Africa. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective of the OMVS Transmission Expansion Project for Western Africa is to enhance electricity trade among Mali, Mauritania, and Senegal.The project consists of two components: (1) RIMA Reinforcement and Expansion; and (2) Technical Assistance. The first component, RIMA reinforcement and expansion will finance the construction of a new 288 km long 225 kV double circuit transmission line from Kayes (Mali) to Tambacounda (Senegal), with an estimated wheeling capacity of 400 MW. The line earth system will be equipped with a fiber optic cable (24 pairs) and equipment required to provide electricity access to villages along the route of the line. To connect the line to the system, the IDA Credit will also finance two 225 KV bays at the existing substation in Kayes and at the future substation in Tambacounda. The latter substation is under construction under the World Bank’s cofinanced Organisation pour la Mise en Valeur du fleuve Gambie (OMVG) Interconnection Project. This component divided into two sub-component, (i) Kayes-Tambacounda Transmission Line; and (ii) Supervisory Control and Data Acquisition (SCADA) System; The second component, technical assistance will finance the contract of the Owner’s Engineer that will assist Société de Gestion de l’Energie de Manantali (SOGEM) in implementing the project, including assistance in the procurement process and undertaking the supervision of the works included under sub component 1.1. In addition, this component will finance consultancy services to strengthen SOGEM’s capabilities to implement the Environmental and Social Management Plan (ESMP), Environmental and Social Impact Assessment (ESIA), Resettlement Policy Framework (RPF), and Resettlement Action Plans (RAPs) as well as operating costs.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Central African Republic (CAR)

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Power Generation (CCGT), Broadband, Forest Products and Packaging, Telecommunications, Government, Hydro, Automotive

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project