On-Call Wastewater Pre-Treatment System Services REBID IQC
Sector: Water Supply and Storage • Location: Lexington, Massachusetts, United States of America
Source: Dodge
A description of the current wastewater treatment installed in the Lexington schools included within this contract is provided below. Bridge and Bowman Elementary Schools In the boiler room of each elementary school, gravity-fed influent water from the HVAC units flows to a 50-gallon tank containing limestone chips that is installed beneath the floor slab. The effluent from the limestone chip tank
- Status
- Closed
- Sector
- Water Supply and Storage, Advanced Electronics, Government, Bridge, Waste Processing and Treatment, Commercial, Manufacturing (Industrial)
- Location
- Lexington, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about On-Call Wastewater Pre-Treatment System Services REBID IQC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A description of the current wastewater treatment installed in the Lexington schools included within this contract is provided below. Bridge and Bowman Elementary Schools In the boiler room of each elementary school, gravity-fed influent water from the HVAC units flows to a 50-gallon tank containing limestone chips that is installed beneath the floor slab. The effluent from the limestone chip tank is discharged to the sanitary sewer. A Signet 2714 pH sensor installed at the upstream end of th... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Lexington |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Advanced Electronics, Government, Bridge, Waste Processing and Treatment, Commercial, Manufacturing (Industrial) |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
