logo
ProjectProposed

On-Site Power for Data Centers

Sector: Power Generation (CCGT)

Source: Microgrid Knowledge

A report by Bloom Energy predicts that data center capacity could reach 80 GW by 2030, highlighting the growing role of on-site power generation in meeting energy demands. The report indicates that approximately 30% of data center sites are expected to utilize some form of on-site power by 2030, a significant increase from current levels.

Status
Prospective
Sector
Power Generation (CCGT), Data Center
Updated
22 Jul 2026
Source
Microgrid Knowledge

ConstructChat

Ask ConstructChat about On-Site Power for Data Centers

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “On-Site Power for Data Centers” is an infrastructure initiative in the Power Generation (CCGT) sector. Taiyo aggregates data on it from Microgrid Knowledge.

Participants

Not available for this record.

Status

Original status

Proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A report by Bloom Energy predicts that data center capacity could reach 80 GW by 2030, highlighting the growing role of on-site power generation in meeting energy demands. The report indicates that approximately 30% of data center sites are expected to utilize some form of on-site power by 2030, a significant increase from current levels.

Original sector

Energy

Location

Not available for this record.

Source

Source

Microgrid Knowledge

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Data Center

Article published date

2025-01-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project