logo

Oncopole solar PV project

Sector: Power Generation (CCGT) • Location: Toulouse, Occitanie, France

Source: Enlit World

Project
Completed

The 15MW Oncopole solar PV project in Toulouse, France, is a symbolic urban renewable energy development transforming the site of the 2001 AZF factory explosion into a landmark of regeneration. Spread across 25 hectares, it comprises 35,000 solar panels and generates approximately 19,000MWh of electricity annually, powering more than 4,000 homes and supplying nearby facilities including a hospital

Project Information FAQ

Project Information

3 Q
The project “Oncopole solar PV project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Toulouse, Occitanie, France. Taiyo aggregates data on it from Enlit World.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The 15MW Oncopole solar PV project in Toulouse, France, is a symbolic urban renewable energy development transforming the site of the 2001 AZF factory explosion into a landmark of regeneration. Spread across 25 hectares, it comprises 35,000 solar panels and generates approximately 19,000MWh of electricity annually, powering more than 4,000 homes and supplying nearby facilities including a hospital and cancer research institute. The project features a land art installation called Rainbow Blast with 1,500 coloured solar panels arranged to reflect the intensity of the original explosion. The site posed technical challenges due to flood zone location and contaminated ground conditions, requiring overhead cabling and no excavation. Its urban location made construction complex but advantageous for generating power close to consumption.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data