One Beverly Hills Mixed Use Development Master Report
Design development · California · Last reported Feb 2025
Source: Dodge
Plans call for the construction of a collection of mid-rise and high-rise buildings containing a combined total of 255 condominiums, 79 hotel suites, and approximately 30,000 square feet of commercial space. Parking for roughly 1,900 vehicles would be located in a subterranean structure.
- Status
- Prospective
- Sector
- Consumer Products, Hotel, Car parking, Automotive, Residential, Commercial, Manufacturing (Industrial)
- Location
- Beverly Hills, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about One Beverly Hills Mixed Use Development Master Report
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Plans call for the construction of a collection of mid-rise and high-rise buildings containing a combined total of 255 condominiums, 79 hotel suites, and approximately 30,000 square feet of commercial space. Parking for roughly 1,900 vehicles would be located in a subterranean structure. |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Beverly Hills |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Hotel, Car parking, Automotive, Residential, Commercial, Manufacturing (Industrial) |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
