One Concrete Box Culvert Construction
Sector: Water Supply and Storage • Location: Columbus, Nebraska, United States of America
Source: Dodge USA
For the construction of one concrete box culvert, grading, doweled concrete pavement, and other related incidental work. The project is located on 175 Avenue between 385 Street and 400 Street in Platte County, Nebraska. The project is referred to as Creston Southeast, C-71(652) and shall include all labor, materials, transportation and equipment required for the construction of a twin 12' x 12' x
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Cement, Government, Waste Processing and Treatment, Commercial
- Location
- Columbus, Nebraska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about One Concrete Box Culvert Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | For the construction of one concrete box culvert, grading, doweled concrete pavement, and other related incidental work. The project is located on 175 Avenue between 385 Street and 400 Street in Platte County, Nebraska. The project is referred to as Creston Southeast, C-71(652) and shall include all labor, materials, transportation and equipment required for the construction of a twin 12' x 12' x 55' concrete box culvert on a 0 skew and other incidental work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nebraska |
City | Columbus |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Cement, Government, Waste Processing and Treatment, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
