logo
ProjectBid Results

One Concrete Box Culvert Construction

Bid results · Nebraska · Last reported Oct 2024

Source: Dodge USA

For the construction of one concrete box culvert, grading, doweled concrete pavement, and other related incidental work. The project is located on 175 Avenue between 385 Street and 400 Street in Platte County, Nebraska. The project is referred to as Creston Southeast, C-71(652) and shall include all labor, materials, transportation and equipment required for the construction of a twin 12' x 12' x

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Cement, Government
Location
Columbus, Nebraska, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about One Concrete Box Culvert Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “One Concrete Box Culvert Construction” is an infrastructure initiative in the Water Supply and Storage sector, located in Columbus, Nebraska, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

For the construction of one concrete box culvert, grading, doweled concrete pavement, and other related incidental work. The project is located on 175 Avenue between 385 Street and 400 Street in Platte County, Nebraska. The project is referred to as Creston Southeast, C-71(652) and shall include all labor, materials, transportation and equipment required for the construction of a twin 12' x 12' x 55' concrete box culvert on a 0 skew and other incidental work.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Nebraska

City

Columbus

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Cement, Government

Article published date

2024-10-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project