One Hollywood Residences-Swimming Pool-Parking
Sector: Cement • Location: Hollywood, Florida, United States of America
Source: Dodge USA
1.17-acre site - 248 apartments ranging from 492 to 1,346 sq ft with 32 studio, 122 1-bedroom, 96 2-bedroom and 45 3-bedroom units, amenity deck on 7th floor, swimming pool, library, spa, fitness center, clubroom/lounge, 8,500 sq ft commercial parking for 398 vehicles
- Status
- Prospective
- Sector
- Cement, Education, Commercial, Automotive, Car parking, Manufacturing (Industrial), Residential
- Location
- Hollywood, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about One Hollywood Residences-Swimming Pool-Parking
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1.17-acre site - 248 apartments ranging from 492 to 1,346 sq ft with 32 studio, 122 1-bedroom, 96 2-bedroom and 45 3-bedroom units, amenity deck on 7th floor, swimming pool, library, spa, fitness center, clubroom/lounge, 8,500 sq ft commercial parking for 398 vehicles |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Hollywood |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Education, Commercial, Automotive, Car parking, Manufacturing (Industrial), Residential |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
