Ontario Line - Southern Civil, Stations and Tunnel
Sector: Cable car • Location: Toronto, Ontario, Canada
Source: P3Spectrum, Canada
Opportunity Subway Program – Overview The Greater Toronto and Hamilton Area (“GTHA”) is experiencing unprecedented growth calling for corresponding expansion of its transportation network. Expanding the transit system is essential. Increasing the transit network’s capacity into downtown Toronto, other major employment areas and neighbourhoods throughout the City is critical to unlocking the GTHA’
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Opportunity Subway Program – Overview The Greater Toronto and Hamilton Area (“GTHA”) is experiencing unprecedented growth calling for corresponding expansion of its transportation network. Expanding the transit system is essential. Increasing the transit network’s capacity into downtown Toronto, other major employment areas and neighbourhoods throughout the City is critical to unlocking the GTHA’s potential as a leading international metropolitan region and maintaining the GTHA’s appeal to people and major employers. The Province of Ontario’s New Subway Transit Plan for the Greater Toronto and Hamilton Area contemplates $28.5 billion in new subway construction in the Toronto area along four priority subway projects, which include: Ontario Line Scarborough Subway Extension Yonge North Subway Extension Eglinton Crosstown West Extension Ontario Line – Overview The “Ontario Line” is a stand-alone, rapid transit system that connects Ontario Science Centre to Exhibition/Ontario Place. The “Initial Business Case” proposes Ontario Line as approximately 16km in length with 15 potential stations. Over half of the route is in tunnel and served by 8 underground stations. There are six interchange/intermodal stations, connecting to GO train services at Exhibition/Ontario Place and East Harbour, and to the Toronto Transit Commission (“TTC”) subway network on Line 1 at both Queen and Osgoode stations, on Line 2 at Pape station, and to the future Eglinton Crosstown LRT (Line 5) at the Ontario Science Centre. Stations will also provide connections to surface bus and streetcar routes. A key feature of the Ontario Line is the proposed service level, with the ability of trains to operate at 90 second headways. This will involve the operation of rolling stock with driverless technology. Ontario Line - Detailed Description The Ontario Line will be delivered in the following three (3) separate procurement contracts: Rolling Stock, Systems, Operations and Maintenance Contract (“RSSOM Contract”, or the “Project”) Southern Civil, Stations and Tunnel Contract (“South Civil Contract”) Northern Civil, Stations and Tunnel Contract (“North Civil Contract”) All three (3) contracts will be delivered as P3 projects. The South Civil Contract (this RFQ) is intended to be delivered using a Design-Build and Finance (“DBF”) model. It has a direct interface with the RSSOM Contract. Management of Integration Risk The Sponsors recognize that delivering Ontario Line through multiple projects results in increased retained integration risk that the Sponsors will need to proactively manage. The Sponsors are considering a number of tools to manage these integration risks: Creation of clear scope responsibilities and boundaries in each respective Project Agreement, along with defined interface obligations. A series of commercially confidential meetings during the RFP in-market period with proponents of both RSSOM and South Civil to ensure that the PSOS for the two projects are developed on a back-to-back basis to ensure that between them there are no gaps, overlaps or conflicts. It is currently anticipated that the integration process will require the Sponsors and the RSSOM and South Civil Project Co(s) to work together during a set period of time following identification of First Negotiations Proponent (“FNP”) to resolve any conflicts and inconsistencies through various coordination and conflict resolution workshops. An Interface Agreement to be entered into by the Sponsors and the project companies for both RSSOM and South Civil (with provisions for adding North Civil Project Co when that project reaches financial close). The Interface Agreement, together with the Project Agreement, would address various areas of coordination and interface between the parties and will include establishment of interface committees, design development, work schedules, site access and health and safety. The details of the Interface Agreement would be made available to proponents during the RFP in-market period and the form of agreement proponents would be expected to enter would be a schedule to the Project Agreement and settled prior to bid submission. South Civil Contract - Scope of Work The South Civil Contract is responsible for the design, construction and handover of all tunnels, stations and civil works between Exhibition Station and a portal location within the Don Yard. The general scope includes 6 km of tunnel, seven stations, two portals and the associated approach structures and guideways up to grade. The South Civil Contract will also design, construct and handover those buildings required for traction power systems, system equipment rooms, emergency exit buildings (“EEBs”) and other ancillary facilities required for this section of the Ontario Line. The primary design and construction elements required in this contract will include, without limitation, the following: Stations: seven stations will be designed, constructed and commissioned. Tunnels: 6km of Tunnels, two portals and their approaches, tunnel launch shafts and associated work will be between Exhibition station to a prescribed portal location between Corktown and west of Don River. Approximate route length of seven (7) kilometers. Civils: the contract is responsible for a range of civil works and ancillary building works, including: Utility works as prescribed in the RFP or as required for the design and construction methods developed by the contractor. Guideway construction which will be to the underside of track structure to be installed by RSSOM Contract; covering the route: Exhibition Station through to the west portal. Full length of running tunnels mined caverns and through stations. East portal to an at grade tie-in with the Early Works (as described above). South Civil Contract to provide first stage slab in tunnel inverts. All ground works, temporary, permanent and remediation, required for the construction of the tunnels, stations and any ancillary buildings. Drainage within the tunnel and for the at grade guideway, including any pumping stations and outfall connections. Conduits required along the guideway, in the tunnel and through stations as required for building M&E and transit systems. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
