logo
ProjectBidding

Opelika Single-Span Utility Bridge

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

The work included within this Contract will consist of the fabrication and installation of one (1) single-span box truss utility bridge. The utility bridge shall carry one (1) 12-inch ductile iron water main encased in a 24-inch welded steel casing (WTM included in a separate contract). The utility bridge will be installed crossing Saugahatchee Creek, paralleling Grand National Parkway in Opelika,

Status
Prospective
Sector
Water Supply and Storage, Metal, Steel, Commercial, Bridge, Road, Manufacturing (Industrial), Power Transmission, Power Generation (CCGT), Government
Location
Opelika, Alabama, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Opelika Single-Span Utility Bridge

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Opelika Single-Span Utility Bridge” is an infrastructure initiative in the Water Supply and Storage sector, located in Opelika, Alabama, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work included within this Contract will consist of the fabrication and installation of one (1) single-span box truss utility bridge. The utility bridge shall carry one (1) 12-inch ductile iron water main encased in a 24-inch welded steel casing (WTM included in a separate contract). The utility bridge will be installed crossing Saugahatchee Creek, paralleling Grand National Parkway in Opelika, Alabama.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Alabama

City

Opelika

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Metal, Steel, Commercial, Bridge, Road, Manufacturing (Industrial), Power Transmission, Power Generation (CCGT), Government

Article published date

2025-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project