logo

Open Library / ARP studio

Sector: Forest Products and Packaging • Location: Slovenia

Source: ArchDaily

Project
Closed

The primary school library is therefore a place that puts the book at the center, where it is accessible both in quiet times and at school breaks, when it suddenly invites pupils in. At the same time, the library space is multifunctional, as it can be transformed into a temporary classroom, a space for storytelling, book presentations, socializing, or a space for writing (and copying) homework.The

Project Information FAQ

Project Information

3 Q
The project “Open Library / ARP studio” is an infrastructure initiative in the Forest Products and Packaging sector, located in Slovenia. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The primary school library is therefore a place that puts the book at the center, where it is accessible both in quiet times and at school breaks, when it suddenly invites pupils in. At the same time, the library space is multifunctional, as it can be transformed into a temporary classroom, a space for storytelling, book presentations, socializing, or a space for writing (and copying) homework.The placement in the hall was not without dilemmas. As library users, we are primarily looking for the tranquility in the library. That said, the library is not without its demands - it requires silence, where we can concentrate on books.The Open Library is located in the central hall of the Vič Primary School inLjubljana. The library is created with a new structure that runs around the perimeter of the two-story hall and surrounds it. The added structure allows children to see the books and the library at all times. From the first floor, there are views of what is happening in the library. A strong emphasis is also on the preservation of the common space for children, which is enriched with books as objects of knowledge.Text description provided by the architects.Sometimes very ordinary client requests lead to surprising twists and turns and final solutions. Due to the growing number of children and limited space of the school, the school management decided to locate the new classroom in a two-story hall in the center of the school. Such a classroom would not have had adequate lighting and would have had no direct contact with the outside. In addition, the hall is a common space for all pupils. We have therefore proposed a replacement – instead of a classroom, a new library should be placed in the hall. Consequently, the new classroom would be located in the space previously occupied by the library.In the central hall, some of the usual calm is forgone, as the school's 45-minute lessons are interrupted by loud five-minute breaks. A primary school library is different from a public or a study library. In the school library, pupils learn about books and reading culture, acquire reading habits, and learn to concentrate. They get used to books and use them to better understand themselves and the world, which opens up again and again into the unknown. By consciously persisting in reading, the book becomes part of the child's everyday life.The library is designed as a light and translucent. The structure consists of primary timber elements that define the spatial grid in plan and view. Metal frames are inserted between the primary timber grid. Each element in the perimeter structure has its role, both structurally and visually. The clarity of the structural design was evident during construction, where the stacking system allowed the whole structure to be erected quickly. The bookcases are placed on the inside along the lower part of the structure. The semicircular staircase, which was closed before the intervention, was reopened and incorporated into the new intervention.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data