logo

Open Window School Campus Expansion

Sector: Steel • Location: Bellevue, Washington, United States of America

Source: Dodge

Project
Start

This new Sentential building will be an addition to the existing Heckerman Hall, with a design concept that is similar to the Science Lab & ILT building adjacent to Robinson Hall. Positioned on the west side of the Heckerman building, the addition will be situated to the south of the main office entry and playground, and north of the existing single-story Music Lab. The project is expected to be t

Status
Prospective
Sector
Steel, Wind, Commercial, Education, Residential, Manufacturing (Industrial)
Location
Bellevue, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Open Window School Campus Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Open Window School Campus Expansion” is an infrastructure initiative in the Steel sector, located in Bellevue, Washington, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

start

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This new Sentential building will be an addition to the existing Heckerman Hall, with a design concept that is similar to the Science Lab & ILT building adjacent to Robinson Hall. Positioned on the west side of the Heckerman building, the addition will be situated to the south of the main office entry and playground, and north of the existing single-story Music Lab. The project is expected to be two stories, 1,190 square feet for level one and 1,400 square feet for level two, totaling approxi...

Budget

Location

Country

United States of America (USA)

State

Washington

City

Bellevue

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Steel, Wind, Commercial, Education, Residential, Manufacturing (Industrial)

Article published date

2025-07-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project