Opera House Addition Phase 1
One of 10,000+ projects Taiyo tracks in Nebraska.
Source: Dodge
The overall project is a 3,856 sf, three-story addition to an historic masonry building, divided into two phases. This current project is the first of the two phases; it is limited to the first floor concrete pad (2,337 sf footprint) and it s footings and foundation. The scope will include necessary site grading, footings and foundations, elevator pit and cover, exterior ramp and stair, railings,
- Status
- Closed
- Sector
- Power Generation (CCGT), Car parking, Rail, Automotive, Cement, Manufacturing (Industrial), Commercial
- Location
- Friend, Nebraska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Opera House Addition Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The overall project is a 3,856 sf, three-story addition to an historic masonry building, divided into two phases. This current project is the first of the two phases; it is limited to the first floor concrete pad (2,337 sf footprint) and it s footings and foundation. The scope will include necessary site grading, footings and foundations, elevator pit and cover, exterior ramp and stair, railings, minor parking lot grading and paving, and roughins for future mechanical, electrical, and plumbin... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nebraska |
City | Friend |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Car parking, Rail, Automotive, Cement, Manufacturing (Industrial), Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
