logo

Operation and Maintenance of 550 MLD Water Treatment Plant at Cauvery Water Supply Scheme Phase-IV

The status, timeline and source of this project. A free account opens every field.

Source: NDTV Profit

Project
Planned

Comprehensive operation and maintenance (O&M) of the 550 MLD water treatment plant at Stage-II of Phase-IV of the Cauvery Water Supply Scheme at TK Halli for a period of five years.

Status
Prospective
Sector
Water Supply and Storage
Location
Bengaluru, Karnataka, India
Updated
22 Jul 2026
Source
NDTV Profit

ConstructChat

Ask ConstructChat about Operation and Maintenance of 550 MLD Water Treatment Plant at Cauvery Water Supply Scheme Phase-IV

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Operation and Maintenance of 550 MLD Water Treatment Plant at Cauvery Water Supply Scheme Phase-IV” is an infrastructure initiative in the Water Supply and Storage sector, located in Bengaluru, Karnataka, India. Taiyo aggregates data on it from NDTV Profit.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Comprehensive operation and maintenance (O&M) of the 550 MLD water treatment plant at Stage-II of Phase-IV of the Cauvery Water Supply Scheme at TK Halli for a period of five years.

Original sector

Water Treatment

Budget

Location

Country

India

State

Karnataka

City

Bengaluru

Source

Source

NDTV Profit

URL

More Details

Record type

Project

Sector

Water Supply and Storage

Article published date

2025-12-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project