logo

Oppidan Data Center

Sector: Power Generation (CCGT) • Location: Reno, Nevada, United States

Source: AOL

Project
Under Construction

The Oppidan Data Center is a 61,500-square-foot data center located at 9630 N Virginia St. in Reno. The application was submitted in November 2024 and approved in March 2025. It is down the street from the Webb Data Center near Stead Boulevard. The project was issued building permits and is currently under construction as of May 2026. It plans to use 8 acre-feet of water and 8 megawatts of power p

Status
Under Construction
Sector
Power Generation (CCGT), Water Supply and Storage, Commercial, Data Center, Manufacturing (Industrial), Road
Location
Reno, Nevada, United States of America
Updated
22 Jul 2026
Source
AOL

ConstructChat

Ask ConstructChat about Oppidan Data Center

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Oppidan Data Center” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Reno, Nevada, United States. Taiyo aggregates data on it from AOL.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Oppidan Data Center is a 61,500-square-foot data center located at 9630 N Virginia St. in Reno. The application was submitted in November 2024 and approved in March 2025. It is down the street from the Webb Data Center near Stead Boulevard. The project was issued building permits and is currently under construction as of May 2026. It plans to use 8 acre-feet of water and 8 megawatts of power per year, equivalent to water use for 8 to 16 homes and power use for 3,200 to 7,200 homes.

Original sector

Data Center

Location

Country

United States of America (USA)

State

Nevada

City

Reno

Source

Source

AOL

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Water Supply and Storage, Commercial, Data Center, Manufacturing (Industrial), Road

Article published date

2026-06-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project