Optima Maharashtra Hybrid Wind-Solar Project
Sector: Power Generation (CCGT) • Location: Maharashtra, India
Source: Inquirer
ACEN Corp. and BrightNight have initiated the testing and commissioning of the Optima Maharashtra project, a hybrid wind-solar park in India. This facility is expected to generate 115 megawatts of electricity and supply power to approximately 230,000 homes annually, while significantly reducing carbon emissions.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Wind, Solar
- Location
- Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- Inquirer
ConstructChat
Ask ConstructChat about Optima Maharashtra Hybrid Wind-Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ACEN Corp. and BrightNight have initiated the testing and commissioning of the Optima Maharashtra project, a hybrid wind-solar park in India. This facility is expected to generate 115 megawatts of electricity and supply power to approximately 230,000 homes annually, while significantly reducing carbon emissions. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Maharashtra |
Source
Source | Inquirer |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Wind, Solar |
Article published date | 2025-01-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
