logo

Oracle Michigan Data Center Campus

Sector: Water Supply and Storage • Location: Saline Township, Michigan, United States

Source: Engineering News-Record (ENR)

Project
Under Construction

A $16 billion hyperscale data center campus under construction in Saline Township, Michigan, near Ann Arbor. The project includes three single-story compute buildings totaling more than 1.6 million sq ft, an 80,000-sq-ft core building, and two dedicated substations, designed to deliver over 1 gigawatt of computing capacity. It features a closed-loop, air-cooled system to limit water use and aims f

Status
Under Construction
Sector
Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Data Center, Commercial
Location
Saline Township, Michigan, United States of America
Updated
22 Jul 2026
Source
Engineering News-Record (ENR)

ConstructChat

Ask ConstructChat about Oracle Michigan Data Center Campus

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Oracle Michigan Data Center Campus” is an infrastructure initiative in the Water Supply and Storage sector, located in Saline Township, Michigan, United States. Taiyo aggregates data on it from Engineering News-Record (ENR).

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A $16 billion hyperscale data center campus under construction in Saline Township, Michigan, near Ann Arbor. The project includes three single-story compute buildings totaling more than 1.6 million sq ft, an 80,000-sq-ft core building, and two dedicated substations, designed to deliver over 1 gigawatt of computing capacity. It features a closed-loop, air-cooled system to limit water use and aims for LEED certification. The project is backed by Blackstone and PIMCO and is developed for Oracle and OpenAI.

Original sector

Power & Industrial

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Saline Township

Source

Source

Engineering News-Record (ENR)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Data Center, Commercial

Article published date

2026-05-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project