Orai Barah Highway Project
Sector: Road • Location: India
Source: World Bank Group
In January 2006, National Highways Authority of India (NHAI) awarded a 17.5 year concession to OB Infrastructure Limited (OBIL) to upgrade, finance, operate and maintain 62.8 km of highway in Uttar Pradesh state: Orai-Bhognipur (35 km) section of National Highway number 25 and Bhognipur-Barah (27.8 km) section on National highway number 2. The project primarily involved conversion of the existing
- Status
- Prospective
- Sector
- Road, Commercial, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Orai Barah Highway Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In January 2006, National Highways Authority of India (NHAI) awarded a 17.5 year concession to OB Infrastructure Limited (OBIL) to upgrade, finance, operate and maintain 62.8 km of highway in Uttar Pradesh state: Orai-Bhognipur (35 km) section of National Highway number 25 and Bhognipur-Barah (27.8 km) section on National highway number 2. The project primarily involved conversion of the existing two lane road to a four lane expressway. The concession term included a construction period of 30 months. OBIL, a special purpose company established to implement this project, was a joint venture between Nagarjuna Construction Company Ltd (64%) and KMC Constructions Ltd (36%). OBIL won the project in an international competitive tender, conducted by NHAI, by quoting the lowest annuity. Under the concession, OBIL was compensated for the capital costs and operating costs including returns by way of a fixed semi annual payment (annuity) from the NHAI in the amount of US$ 9.9 million during the operational period of 15 years. Under the annuity scheme, the private operator (OBIL) cannot collect tolls from the users of the facility. The total capital cost of the project was estimated at US$ 117.3 million. Construction work on the project began in October 2006 and was expected to be completed by April 2009. None None |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in India
- Dholera Solar Park Gujarat
- Sugen 1100MW CCGT Akhakhol Gujarat
- ONGC Tripura Power Plant
- Cable-stayed bridge project in the Chambal River
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- RattanIndia Power Limited (Amravati Thermal Power Project)
- GVRMP Belgaum Khanapur Tollway Private Limited