Orakei Infrastructure Project
One of 6,587 projects Taiyo tracks in Auckland.
Source: Auckland Transport
This is the construction phase of 3 projects in the Orakei area that have been incorporated into one construction contract. These are: i) Ngapipi Pedestrian Bridge, ii) Tamaki Dr Northern Footpath and Handrail and iii) Kepa Rd Retaining Wall.
- Status
- Closed
- Sector
- Bridge, Government
- Location
- Auckland, New Zealand
- Updated
- 22 Jul 2026
- Source
- Auckland Transport
ConstructChat
Ask ConstructChat about Orakei Infrastructure Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This is the construction phase of 3 projects in the Orakei area that have been incorporated into one construction contract. These are: i) Ngapipi Pedestrian Bridge, ii) Tamaki Dr Northern Footpath and Handrail and iii) Kepa Rd Retaining Wall. |
Location
Country | New Zealand |
State | Auckland |
Source
Source | Auckland Transport |
More Details
Record type | Project |
Sector | Bridge, Government |
Article published date | 2024-01-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
