logo

Orange Obras Civiles Offices / Agustín Lozada

Sector: Airport • Location: Argentina

Source: ArchDaily

Project
Closed

Text description provided by the architects.The office project for the company Orange Obras Civiles, located in Córdoba capital a few meters from the airport, within the Airport Business Park, is developed in a large building, where the offices for this order are located.This situation generated the first challenge: Reinterpreting the workspace in an industry, where the dynamics of the market prod

Project Information FAQ

Project Information

3 Q
The project “Orange Obras Civiles Offices / Agustín Lozada” is an infrastructure initiative in the Airport sector, located in Argentina. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Text description provided by the architects.The office project for the company Orange Obras Civiles, located in Córdoba capital a few meters from the airport, within the Airport Business Park, is developed in a large building, where the offices for this order are located.This situation generated the first challenge: Reinterpreting the workspace in an industry, where the dynamics of the market produce constant changes in the volume of confluence in it, added to the company's growth, which constantly conditions the use of the space.The starting point was an open plan, which was made up of 4 modules, resulting in 360m2 in total. The main idea was to zone the plant according to the main areas that the organization had. Generating limits through useful saving walls as well as through transparent elements.The programmatic structure of the project is based on two central modules, a place that encourages collective and collaborative work. At its extremes, one of the modules is intended for links outside the organization, from which it is entered. Finally, the module at the other end is intended for leisure activities, such as recreation, internal training, and dining room, among others, with secondary access. As for the linear program in direct relation to the visuals, offices are arranged with permeable limits, where quieter and more private atmospheres are generated according to the requirements.The choice of materials responds to the corporate identity, where exposed coffered slabs and clear equipment predominate, generating contrast and making it comfortable. Through them, lighting and spaciousness are enhanced, prioritizing a general well-being.It was requested to move the organization's headquarters to a new location for the third time in a few years, due to the changes in scale that occurred in its structure in the last period.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data