Orashi 33/11kV Injection Substation and Power Infrastructure Expansion
Under construction · Imo · Last reported Jul 2026
Source: Head Topics
The Orashi 33/11kV Injection Substation supplies virtually the entire New Owerri axis with reliable electricity. The state is replicating the project with a 15MVA injection substation at Amoma Polytechnic, constructing a 50-kilometre 132kV transmission line from Owerri to Olu, and installing transformers at Egbu Transmission Station and Okigwe under the Presidential Power Initiative.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Government, Hotel
- Location
- Owerri, Imo, Nigeria
- Updated
- 22 Jul 2026
- Source
- Head Topics
ConstructChat
Ask ConstructChat about Orashi 33/11kV Injection Substation and Power Infrastructure Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Orashi 33/11kV Injection Substation supplies virtually the entire New Owerri axis with reliable electricity. The state is replicating the project with a 15MVA injection substation at Amoma Polytechnic, constructing a 50-kilometre 132kV transmission line from Owerri to Olu, and installing transformers at Egbu Transmission Station and Okigwe under the Presidential Power Initiative. |
Original sector | Energy |
Location
Country | Nigeria |
State | Imo |
City | Owerri |
Source
Source | Head Topics |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Hotel |
Article published date | 2026-07-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
