Orbit House / Estudio PK
Closed · Argentina · Last reported Mar 2024
Source: ArchDaily
The orientation to the north was prioritized, using a central courtyard that visually and functionally articulates the two wings of the base: One contains the flexible space next to the entrance hall and the transition from the street to the interior of the house. The other is directed towards the back of the public area of the house, expanding towards the pool and the lagoon at the back, framing
- Status
- Closed
- Sector
- Steel, Cement, Metal, Road, Residential, Commercial
- Location
- Argentina
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about Orbit House / Estudio PK
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The orientation to the north was prioritized, using a central courtyard that visually and functionally articulates the two wings of the base: One contains the flexible space next to the entrance hall and the transition from the street to the interior of the house. The other is directed towards the back of the public area of the house, expanding towards the pool and the lagoon at the back, framing the landscape. On the southwest side, all service areas are located.The material constitution of the house is based on noble materials with low maintenance: a Concrete structure, volcanic stone cladding at the entrance, tundra grey floors, marble countertops, oak furniture, and aluminum carpentry with double glazed windows. Casa Órbita offers a house with a design capable of appreciating the green landscape that surrounds it and providing users with a unique home to share with family.Text description provided by the architects.Casa Órbita is located on a corner lot; it has two coastal edges, a view towards public green space, and views of the lagoon; the house takes advantage of all its views, enhancing natural lighting most favorably.This second volume separates from the base with a more free language, obtained through curves that direct the program towards the best views. The project has a second social gallery at the front, open to the street. It allows visual transparency from the living room, towards the central lagoon of the neighborhood, facing north.The double-height hall connects the two floors, allowing the private sector on the second level to have constant dialogue with the central courtyard. It not only provides them with an entrance of light with the best orientation, but together with the corten steel perforated panel enclosure at the front, they provide privacy to the bedrooms and the playroom, which with its folding panels achieves an intimate meeting space for the users. |
Location
Country | Argentina |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Steel, Cement, Metal, Road, Residential, Commercial |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in Argentina
- Siderar Power Plant
- San Nicolas
- Fincas Patagónicas S.A.
- DELEGACIÓN MUNICIPAL BARRIO KM 26700 FLORENCIO VARELA
- RUTAS NACIONALES N° 40 Y N°51 PROVINCIA DE SALTATRAMOS: ABRA DEL ACAY SAN ANTONIO DE LOS COBRES Y CAMPO QUIJANOLTE CON CHILE SECCIONES: KM.460100463000 Y KM. 2189KM. 28900 SISTEMA MODULAR
- 1200 SISTEMA DE PRODUCCION Y PROVISION DE AGUA POTABLE PEDEMONTE NORTE LAS HERAS MENDOZA
- RENOVACION DE RED SECUNDARIA DE AGUA GERLIPIÑEYRO
- RENOVACION DE RED SECUNDARIA DE AGUA ACERO LANUS CENTRO Y REMEDIOS DE ESCALADA.
