Orchard Avenue Safety and Connectivity Project Phase 1
Sector: Bridge • Location: Mesa County, Colorado, United States
Source: Mesa County
Phase 1 of the Orchard Avenue Safety and Connectivity Project includes about 1,885 feet of roadway reconstruction, a new roundabout at 31 Road, replacement of the existing culvert and pedestrian bridge over Lewis Wash. The improvements aim to improve traffic flow, reduce conflict points for drivers, and strengthen drainage and pedestrian infrastructure along the corridor.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Phase 1 of the Orchard Avenue Safety and Connectivity Project includes about 1,885 feet of roadway reconstruction, a new roundabout at 31 Road, replacement of the existing culvert and pedestrian bridge over Lewis Wash. The improvements aim to improve traffic flow, reduce conflict points for drivers, and strengthen drainage and pedestrian infrastructure along the corridor. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
