logo

Orchard Park Sewer Main Project

Sector: Car parking • Location: Davis, California, United States of America

Source: UC Davis Projects

Project
Current Projects

The Orchard Road Sewer Main Project will implement Orchard Park Redevelopment (OPR) Project Mitigation Measures 3.17-1. With the proposed sewer line (12” diameter) replacing the existing sewer line (8” diameter) that would be provided by OPR Mitigation Measure 3.17-1, adequate capacity would be available within the wastewater collection system serving the Orchard Park site to accommodate increased

Project Information FAQ

Project Information

4 Q
The project “Orchard Park Sewer Main Project” is an infrastructure initiative in the Car parking sector, located in Davis, California, United States of America. Taiyo aggregates data on it from UC Davis Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

current projects

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Orchard Road Sewer Main Project will implement Orchard Park Redevelopment (OPR) Project Mitigation Measures 3.17-1. With the proposed sewer line (12” diameter) replacing the existing sewer line (8” diameter) that would be provided by OPR Mitigation Measure 3.17-1, adequate capacity would be available within the wastewater collection system serving the Orchard Park site to accommodate increased flows associated with the additional student housing.. The project implements Orchard Park Student Housing Mitigation Measure 3.17-1: Upsize Sewer Line within Orchard Road. The length of replacement is approximately 1,200 linear feet. Construction involves saw cutting approximately 2,600 linear feet of asphalt roadway, excavation/backfill, sheeting and shoring to place the new pipe, trenching for new pipe placement, lateral/sewer main reconnections, repaving to replace the asphalt roadway. The old 8-inch sewer line will be abandoned in-place. The west end will be stubbed at the Orchard redevelopment site while the east end will be connected to 12-inch diameter line in the east side of La Rue Road.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data