Orchard Park Sewer Main Project
Sector: Car parking • Location: Davis, California, United States of America
Source: UC Davis Projects
The Orchard Road Sewer Main Project will implement Orchard Park Redevelopment (OPR) Project Mitigation Measures 3.17-1. With the proposed sewer line (12” diameter) replacing the existing sewer line (8” diameter) that would be provided by OPR Mitigation Measure 3.17-1, adequate capacity would be available within the wastewater collection system serving the Orchard Park site to accommodate increased
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | current projects |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Orchard Road Sewer Main Project will implement Orchard Park Redevelopment (OPR) Project Mitigation Measures 3.17-1. With the proposed sewer line (12” diameter) replacing the existing sewer line (8” diameter) that would be provided by OPR Mitigation Measure 3.17-1, adequate capacity would be available within the wastewater collection system serving the Orchard Park site to accommodate increased flows associated with the additional student housing.. The project implements Orchard Park Student Housing Mitigation Measure 3.17-1: Upsize Sewer Line within Orchard Road. The length of replacement is approximately 1,200 linear feet. Construction involves saw cutting approximately 2,600 linear feet of asphalt roadway, excavation/backfill, sheeting and shoring to place the new pipe, trenching for new pipe placement, lateral/sewer main reconnections, repaving to replace the asphalt roadway. The old 8-inch sewer line will be abandoned in-place. The west end will be stubbed at the Orchard redevelopment site while the east end will be connected to 12-inch diameter line in the east side of La Rue Road. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
