OR/DOT: Hwy 7 Crack Seal Improvements
Sector: Road • Location: Baker City, Oregon, United States of America
Source: Dodge
Baker Hwy 7 Crack Seal upplying all labor, equipment, machinery, material, and traffic control for repairing and resealing cracks in flexible pavements at the described location in the designated state highway section in ODOT district 13
- Status
- Closed
- Sector
- Road, Commercial
- Location
- Baker City, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about OR/DOT: Hwy 7 Crack Seal Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Baker Hwy 7 Crack Seal upplying all labor, equipment, machinery, material, and traffic control for repairing and resealing cracks in flexible pavements at the described location in the designated state highway section in ODOT district 13 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Baker City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Commercial |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
