Ore Towne Solar Project
Sector: Metal • Location: Tucson, Arizona, United States
Source: ABC15 Arizona
The Ore Towne Solar Project is planned to be built on part of a historic decommissioned copper mine owned by BHP Copper in Pinal County, Arizona. The project includes a 145-megawatt utility-scale solar power plant and a 145-MW battery energy storage system (BESS).
- Status
- Prospective
- Sector
- Metal, Solar, Power Transmission, Energy Storage, Power Generation (CCGT)
- Location
- Tucson, Arizona, United States of America
- Updated
- 19 Nov 2026
- Source
- ABC15 Arizona
ConstructChat
Ask ConstructChat about Ore Towne Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Ore Towne Solar Project is planned to be built on part of a historic decommissioned copper mine owned by BHP Copper in Pinal County, Arizona. The project includes a 145-megawatt utility-scale solar power plant and a 145-MW battery energy storage system (BESS). |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Arizona |
City | Tucson |
Source
Source | ABC15 Arizona |
URL |
More Details
Record type | Project |
Sector | Metal, Solar, Power Transmission, Energy Storage, Power Generation (CCGT) |
Article published date | 2026-04-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
