logo
ProjectComplete

Orla Wind Farm

Sector: Road • Location: Poland

Source: European Bank for Reconstruction and Development (EBRD)

The Project’s transition impact stems from three factors: C&C Sp. z o.o. is a special purpose entity incorporated in Poland and fully and indirectly owned by Momentum with 40% stake, Nordex with 40% stake, Eurowatt with 11% stake and Winergy with 9% stake. Provision of a non-recourse long-term financing denominated in Polish Zloty, in the amount of up to PLN 94 million (€22 million equivalent) to

Status
Closed
Sector
Road, Wind, Raw Materials, Residential, Government
Location
Poland
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Orla Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Orla Wind Farm” is an infrastructure initiative in the Road sector, located in Poland. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project’s transition impact stems from three factors: C&C Sp. z o.o. is a special purpose entity incorporated in Poland and fully and indirectly owned by Momentum with 40% stake, Nordex with 40% stake, Eurowatt with 11% stake and Winergy with 9% stake. Provision of a non-recourse long-term financing denominated in Polish Zloty, in the amount of up to PLN 94 million (€22 million equivalent) to finance the construction and operation of Phase I of the Project, representing the entire senior debt financing for Phase I, and up to 35% of the total Project costs. Bank DnB Nord will provide the VAT facility for the Phase 1 of the Project. Approximately PLN 269 million (€64 million). Category B. Environmental and social issues associated with the construction of a medium sized wind farm in Orla, can be readily assessed and mitigated as part of the Bank’s Environmental and Social Due Diligence (ESDD). The Bank retained an independent consultant to undertake an Environmental and Social Diligence (ESDD) of the project. The ESDD confirmed that the Company has the institutional capacity to fully implement the Bank’s Performance Requirements (PRs) and that the wind farm is in compliance with Polish environmental laws and regulations. The ESDD has confirmed that the wind farm is located way from any sensitive receptors, with no residential or protected areas (such as Natura 2000 designated sites) located in the near vicinity. The Project has been subject to a full EIA, in accordance to Polish and EU requirements, inclusive of an alternative and cumulative assessment. As a result of the EIA one of the turbines has been moved away from a road. The ESDD has concluded that appropriate stakeholder engagement has been undertaken and the project complies with Polish and EU environmental requirements. None. For financial matters: Mr. Adam Ofek Cerac Tel: +48517753661 Email: adam.ofek@cerac.eu For project matters: Mr Adam Broncel Winergy Tel: +48601302535

Original sector

Energy

Location

Country

Poland

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Road, Wind, Raw Materials, Residential, Government

Article published date

2025-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project