Orla Wind Farm
Sector: Road • Location: Poland
Source: European Bank for Reconstruction and Development (EBRD)
The Project’s transition impact stems from three factors: C&C Sp. z o.o. is a special purpose entity incorporated in Poland and fully and indirectly owned by Momentum with 40% stake, Nordex with 40% stake, Eurowatt with 11% stake and Winergy with 9% stake. Provision of a non-recourse long-term financing denominated in Polish Zloty, in the amount of up to PLN 94 million (€22 million equivalent) to
- Status
- Closed
- Sector
- Road, Wind, Raw Materials, Residential, Government
- Location
- Poland
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Orla Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project’s transition impact stems from three factors: C&C Sp. z o.o. is a special purpose entity incorporated in Poland and fully and indirectly owned by Momentum with 40% stake, Nordex with 40% stake, Eurowatt with 11% stake and Winergy with 9% stake. Provision of a non-recourse long-term financing denominated in Polish Zloty, in the amount of up to PLN 94 million (€22 million equivalent) to finance the construction and operation of Phase I of the Project, representing the entire senior debt financing for Phase I, and up to 35% of the total Project costs. Bank DnB Nord will provide the VAT facility for the Phase 1 of the Project. Approximately PLN 269 million (€64 million). Category B. Environmental and social issues associated with the construction of a medium sized wind farm in Orla, can be readily assessed and mitigated as part of the Bank’s Environmental and Social Due Diligence (ESDD). The Bank retained an independent consultant to undertake an Environmental and Social Diligence (ESDD) of the project. The ESDD confirmed that the Company has the institutional capacity to fully implement the Bank’s Performance Requirements (PRs) and that the wind farm is in compliance with Polish environmental laws and regulations. The ESDD has confirmed that the wind farm is located way from any sensitive receptors, with no residential or protected areas (such as Natura 2000 designated sites) located in the near vicinity. The Project has been subject to a full EIA, in accordance to Polish and EU requirements, inclusive of an alternative and cumulative assessment. As a result of the EIA one of the turbines has been moved away from a road. The ESDD has concluded that appropriate stakeholder engagement has been undertaken and the project complies with Polish and EU environmental requirements. None. For financial matters: Mr. Adam Ofek Cerac Tel: +48517753661 Email: adam.ofek@cerac.eu For project matters: Mr Adam Broncel Winergy Tel: +48601302535 |
Original sector | Energy |
Location
Country | Poland |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Road, Wind, Raw Materials, Residential, Government |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Poland
- Golice Wind Park
- Design and build of 18.2 km on the S19 highway between Dukla and Barwinek (Poland)
- Design and construction of 18.1 km of the S19 highway between Radzyn and Podlaski (Poland)
- Design and construction of the third section of the A2 over 12 km in the Mińsk Mazowiecki bypass (Poland)
- Cadbury Schweppes Confectionery Factory, Skarbimierz
- Design and construction of 17 km of S3 express road Swinoujscie-Tronszyn in the section between Swinoulscie-Dargobadz (Poland)
- Design and construction of 19.46 km of the S-61 highway between Prodborze and Sniadowo (Poland)
- Design and construction of 6,67 km of the S-7 highway between Plotnisko and Lesznowola (Poland)
