Orting Water Resource Facility - Lagoon Solids Removal
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The work to be performed will include furnishing all labor, materials, and equipment necessary to pump, haul, and deliver approximately 500 dry tons of solids to a solids processing facility nearest the City of Orting, such as Shelton WWTP or BioRecycling North Ranch, and perform all work as required by the Contract within 40 working days. The solids removal will take place in the facultative lago
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial, Government
- Location
- Orting, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Orting Water Resource Facility - Lagoon Solids Removal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be performed will include furnishing all labor, materials, and equipment necessary to pump, haul, and deliver approximately 500 dry tons of solids to a solids processing facility nearest the City of Orting, such as Shelton WWTP or BioRecycling North Ranch, and perform all work as required by the Contract within 40 working days. The solids removal will take place in the facultative lagoon at the City of Orting s Water Resource Recovery Facility. Portions of this project may be remo... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Orting |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
