logo
ProjectPlanned

Osawatomie Data Center Project

The owner, status and timeline of this project. A free account opens every field.

Source: KSHB 41 Kansas City

A proposed $1 billion data center project in Osawatomie, Kansas, planned to be built on 115 acres north of the town. The project includes a 600,000-square-foot campus with 60 to 90 full-time employees upon completion and construction jobs estimated at up to 350. The city entered into a predevelopment agreement with Alcove Development, granting them priority for land surveying and exclusive develop

Status
Prospective
Sector
Natural Gas, Power Generation (CCGT), Data Center, Road
Location
Osawatomie, Kansas, United States of America
Updated
22 Jul 2026
Source
KSHB 41 Kansas City

ConstructChat

Ask ConstructChat about Osawatomie Data Center Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Osawatomie Data Center Project” is an infrastructure initiative in the Natural Gas sector, located in Osawatomie, Kansas, United States. Taiyo aggregates data on it from KSHB 41 Kansas City.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed $1 billion data center project in Osawatomie, Kansas, planned to be built on 115 acres north of the town. The project includes a 600,000-square-foot campus with 60 to 90 full-time employees upon completion and construction jobs estimated at up to 350. The city entered into a predevelopment agreement with Alcove Development, granting them priority for land surveying and exclusive development rights with major tax breaks. The project includes plans for on-site power generation through natural gas.

Original sector

Technology

Budget

Location

Country

United States of America (USA)

State

Kansas

City

Osawatomie

Source

Source

KSHB 41 Kansas City

URL

More Details

Record type

Project

Sector

Natural Gas, Power Generation (CCGT), Data Center, Road

Article published date

2026-05-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project