Osceola County Roadway and Bridge Bundling Program
Sector: Bridge • Location: Florida, United States of America
Source: Federal Highway Administration (FHWA)
In 2000, Osceola County, Florida, faced the challenge of completing a large design and construction program funded by newly adopted impact fees. The program required the concurrent construction of 11 major roadway projects which grew each calendar year as additional designs were complete. Less than seven years into the program, 18 projects were behind schedule largely due to the cumbersome pace of
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In 2000, Osceola County, Florida, faced the challenge of completing a large design and construction program funded by newly adopted impact fees. The program required the concurrent construction of 11 major roadway projects which grew each calendar year as additional designs were complete. Less than seven years into the program, 18 projects were behind schedule largely due to the cumbersome pace of traditional design-bid-build procurements. Design costs were as much as 200% over budget, and the construction projects had incurred over $5 million in change orders. In 2007, a newly appointed county administration devised a plan to bundle the remaining projects and accelerate their completion using the construction manager/general contractor (CM/GC) alternative project delivery method. Under the CM/GC process, project sponsors hire a contractor to provide feedback on the design and constructability during the design phase prior to the start of construction. The bundled program included 11 major roadway projects with a total of 13 bridges. Osceola County engaged six construction managers to participate in the program, matching the type of work to the strengths of each firm. The construction managers worked with the designers to produce efficient construction drawings; teams met weekly to review plans as they were being prepared rather than at major milestones. The construction managers also provided input to the development of the project phasing and maintenance of traffic plans. The teams discussed costs throughout the design process, providing the County with real-time information, rather than waiting for plans to be completed and bid. For some of the projects, the county used a guaranteed maximum price approach for packages of project components. Instead of waiting for construction permits for the entire project to be cleared, work began on right-of-way assembly, utility relocation, and construction of different physical segments of the projects as soon as they were ready, greatly accelerating the process. Thanks to these efficiencies, all 11 major roadway projects were ready to begin construction within a year, compensating for the delays of the previous five years. Funding for the Osceola County Roadway and Bridge Bundling Program came from road impact fees assessed on new property development in the county to pay for related road construction. The County eliminated collection of Road Impact Fees in 2012 but later reinstated them in 2015 as Mobility Fees that may be used for a wider range of transportation system improvements, including roads, transit systems, bikeways and sidewalks. The fee structure was designed to encourage denser land development. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |