logo

O’Shaughnessy Dam Access and Drainage Improvements

Sector: Hydro • Location: San Francisco, California, United States of America

Source: San Francisco Water Power Sewer (SFPUC)

Project
Prospective

Project Background The key elements include of the project include: Replace Access Structures in Ladder Wells. Install Fall Protection Systems. Install new Occupational Safety and Health Administration (OSHA) -compliant ladders and landings with safety cage and/or install fall restraint systems. Install a new spillway ladder. Seal or Mitigate Existing Leakage. Address flowing water by sealing leak

Project Information FAQ

Project Information

4 Q
The project “O’Shaughnessy Dam Access and Drainage Improvements” is an infrastructure initiative in the Hydro sector, located in San Francisco, California, United States of America. Taiyo aggregates data on it from San Francisco Water Power Sewer (SFPUC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

prospective

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Project Background The key elements include of the project include: Replace Access Structures in Ladder Wells. Install Fall Protection Systems. Install new Occupational Safety and Health Administration (OSHA) -compliant ladders and landings with safety cage and/or install fall restraint systems. Install a new spillway ladder. Seal or Mitigate Existing Leakage. Address flowing water by sealing leaks or otherwise diverting, collecting and disposing of flows. Drainage Improvements. Clear the drains in the dam so that water can drain as designed and/or install sump pumps, if appropriate. Replace Watertight Door between Ladder Wells 3 & 4.  This scope item includes replacing the existing watertight door between Ladder Wells 3 & 4. The project is part of a larger Hetchy Capital Improvement Program (HCIP), a multi-year capital program to upgrade or improve water conveyance, water storage, and power generation facilities in the Sierra Nevada portion of the Hetch Hetchy Regional Water System. Project Materials Type - Any - Application-Form Fact Sheet Notice Report Standards and Guidelines Sorry, no materials match your search.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data