Oshaughnessy Dam New Bulkhead System
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
The City and County of San Francisco the City, acting by and through the San Francisco Public Utilities Commission SFPUC, is soliciting Proposals from qualified firms, teams, or joint ventures to provide Design-Build services for Contract: DB-135, OShaughnessy Dam New Bulkhead System the Project.
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Power Transmission, Commercial, Hydro, Water Supply and Storage, Power Generation (CCGT), Government
- Location
- California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Oshaughnessy Dam New Bulkhead System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The City and County of San Francisco the City, acting by and through the San Francisco Public Utilities Commission SFPUC, is soliciting Proposals from qualified firms, teams, or joint ventures to provide Design-Build services for Contract: DB-135, OShaughnessy Dam New Bulkhead System the Project. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Transmission, Commercial, Hydro, Water Supply and Storage, Power Generation (CCGT), Government |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
