logo

OSM EV Assembly Plant in Jafza

Sector: Electric Vehicles (EVs) • Location: Jebel Ali, United Arab Emirates

Source: Press Trust of India

Project
Planned

OSM plans to invest USD 25 million over 5 years to establish an electric vehicle (EV) assembly plant in Jafza.

Status
Prospective
Sector
Electric Vehicles (EVs), Automotive
Location
Jebel Ali, United Arab Emirates
Updated
22 Jul 2026
Source
Press Trust of India

ConstructChat

Ask ConstructChat about OSM EV Assembly Plant in Jafza

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “OSM EV Assembly Plant in Jafza” is an infrastructure initiative in the Electric Vehicles (EVs) sector, located in Jebel Ali, United Arab Emirates. Taiyo aggregates data on it from Press Trust of India.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

OSM plans to invest USD 25 million over 5 years to establish an electric vehicle (EV) assembly plant in Jafza.

Original sector

Built Sector

Budget

Location

Country

United Arab Emirates (UAE)

City

Jebel Ali

Source

Source

Press Trust of India

URL

More Details

Record type

Project

Sector

Electric Vehicles (EVs), Automotive

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project