logo

Osmaniye Wind Power Plant

Sector: Commercial • Location: Osmaniye, Turkey

Source: World Bank Group

Project
Active

Rotor Elektrik Uretim A.S., a project company wholly owned by Zorlu Elektrik Uretim A.S. [Turkey], developed the 135MW Osmaniye Wind Power Plant, located in Osmaniye, southern Turkey. The project was developed on a greenfield, build, own and operate (BOO) basis. In September 2007, Zorlu Group, the project sponsor, acquired an 80% stake in Rotor Elektrik, which had secured the 30-year license to

Status
Prospective
Sector
Commercial, Wind, Power Generation (CCGT), Government
Location
Osmaniye, Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Osmaniye Wind Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Osmaniye Wind Power Plant” is an infrastructure initiative in the Commercial sector, located in Osmaniye, Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Rotor Elektrik Uretim A.S., a project company wholly owned by Zorlu Elektrik Uretim A.S. [Turkey], developed the 135MW Osmaniye Wind Power Plant, located in Osmaniye, southern Turkey. The project was developed on a greenfield, build, own and operate (BOO) basis. In September 2007, Zorlu Group, the project sponsor, acquired an 80% stake in Rotor Elektrik, which had secured the 30-year license to build and operate the project. The EUR220 million (US$305.8 million) project reached financial closure in May 2009, with the signing of the project loan agreements. Financing comprised debt of EUR130 million (US$180.7 million) and equity of EUR90 million (US$125.1 million). The debt comprised a 12-year EUR45 million (US$62.6 million) term loan from EBRD, a 12-year, EUR55 million (US$76.5 million) term loan from IFC and a 10-year EUR30 million (US$41.7 million) term loan from EIB.

Original sector

Energy

Budget

Location

Country

Turkey

State

Osmaniye

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Wind, Power Generation (CCGT), Government

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project